[1]
KHEBBAB, R., REMLI, S., ROUAIGUIA, I. and BENSELHOUB, A. 2016. OPTIMIZATION AND ENERGY SAVING WHEN CHOOSING THE SITE OF INSTALLATION OF A CRUSHING STATION IN A MOUNTAINOUS TERRAIN CASE OF THE DJBEL EL BORDJ CAREER, SIDI BELABBAS, ALGERIA. Journal of Engineering Studies and Research. 22, 4 (Dec. 2016), 13-20. DOI:https://doi.org/10.29081/jesr.v22i4.93.