“OPTIMIZATION AND ENERGY SAVING WHEN CHOOSING THE SITE OF INSTALLATION OF A CRUSHING STATION IN A MOUNTAINOUS TERRAIN CASE OF THE DJBEL EL BORDJ CAREER, SIDI BELABBAS, ALGERIA”. Journal of Engineering Studies and Research 22, no. 4 (December 14, 2016): 13–20. Accessed September 14, 2025. https://jesr.ub.ro/journal/article/view/93.